• We Will go through all the stages of construction
  • 203 Madison Ave, New York, USA
  • info@example.com
Awesome Image

Emirates Real Estate Corp. “EREC” owns and operates the Ministry of Education “MOE” buildings and facilities in the Al Qussais area in Dubai.

The building occupants experience some difficulties and feel uncomfortable with the HVAC system and several complaints rose to EREC regarding insufficient cooling.

The Ministry of Education building is a G+5 building, served with an HVAC system through an adjacent service block housing the main equipment (chillers, pumps … etc.) this system also supplies air conditioning to other three adjacent buildings (Ministry of Education Building, Activities Building, and Ministry of Justice building).

 

SCOPE OF SERVICE

Scope of service for this project includes:

-Site survey to make as-built drawings for the existing HVAC system equipment and installations.
-Technical detailed analysis of existing HVAC system.
-Heat load calculation to verify system capacity

-Suggest technical solutions for the effective operation of the existing system.
– Provide technical suggestions to enhance the system’s efficiency and operation. -Recommend technical suggestions with minimum rearrangement of the existing system or any other requirements for enhanced system performance.

BUILDING MANAGEMENT SYSTEM “BMS” SCOPE:

Study with recommendations for the existing BMS system for the Ministry of Education, Ministry of Labor & Social Affairs, and Ministry of Public Works (3 Adjacent buildings managed by on BMS system) to be upgraded to the newest software available.

– Compressed air system

– Plant air system

Project Information

  • MINISTRY OF EDUCATION – DUBAI
    MINISTRY OF EDUCATION – DUBAI
  • Category:
    Governmental
  • Start Date:
  • End Date:
  • Tag:

  • Budget: